Winter 2016 – Red Rock District Volunteer Trail Work
YOU ARE INVITED TO JOIN THE WINTER 2015 REDROCK VOLUNTEER TRAIL WORK DAY
WHEN:
- January 9 & 23
- February 6 & 20
- March 6
WHERE:
Schuerman Mountain TH at 8:30 am. The trail work will consist of new trail construction and general maintenance in the Carrol Canyon/Scheurman Mountain area. All trail work sessions start at 8:30 am and conclude at 1:00 pm unless otherwise noted.
Directions: From Sedona head west on 89A (towards Cottonwood), turn left on Upper Red Rock Loop Road. Continue on Upper Red Rock Loop Road for .25 mile and take a right onto Red Rock High School Drive. The Scheurman Mountain Trailhead will be on the left.
What to bring:
- Sturdy closed-toe shoes
- Long pants
- Sunscreen, water and snacks
- Gloves
- Bike helmet or hard hat (if available)
For more information please call or email:
Forrest Saville, Trail Coordinator (928) 606-1748 or email atsfsaville@fs.fed.us